MIL-STD-1822A(USAF)
APPENDIX B
CERTIFICATION REQUIREMENTS PLAN (CRP) DEVELOPMENT PROCESS
B.1 SCOPE. B.1.1 Scope.
As discussed in Section 1, the major elements of nuclear weapon system Nuclear Certification are: design certification, and operational certification. Components of design certification are: compatibility certification (the focus of this MIL-STD), nuclear safety design certification, weapon system safety rules (WSSR) development, and Technical Order (TO) certification.
The certification process is initiated by the Nuclear Certification Impact Statement (NCIS) followed by (if required) the development of the Basic Certification Requirements Plan (BCRP); once coordinated and signed by the process owners, the BCRP is presented to the Single Manager. The Single Manager (SM) will develop the Certification Requirements Plan (CRP) using the BCRP as a baseline; the SM is responsible for the CRP's execution. The CRP process, discussed below, is outlined on FIGURE B-1. This Appendix is a mandatory part of the standard. The information contained herein is intended for compliance.
B.2 APPLICABLE DOCUMENTS AIR FORCE INSTRUCTIONS
AFI91-107 Design, Evaluation, Troubleshooting, and Maintenance Criteria for
Nuclear Weapon Systems
AIR FORCE MANUALS
AFMAN91-118 Safety Design and Evaluation Criteria for Nuclear Weapon Systems
AFMAN91-119 Safety Design and Evaluation Criteria for Nuclear Weapon Systems
Software
(Copies of these documents are available on line at https://www.e-publishing.af.mil/.)
44
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business