MIL-STD-1822A(USAF) APPENDIX A
a. F-15E: 22 stations required; five aircraft over a two-year moving window if five stations remain certified on the aircraft, eight aircraft over a two-year moving window if certified stations are reduced to three per aircraft.
b. F-16C/D: 22 stations required; 11 aircraft over a two-year moving window
c. B-2A: 21 stations required; two aircraft over a two-year moving window. This is based on eight stations per RLA (Rotary Launcher Assembly), and the number of RLAs at the B-2A home station.
d. B-52H: 22 stations required for gravity bombs; three aircraft over a two-year moving window. NOTE: Surveillance testing is not currently conducted on cruise missiles since they are not governed by System 1 Specification. SNL conducts a functional check of AMAC signals between the aircraft and cruise missile with nominal electrical current loads, but does not measure the signals at the W80-1 to ALCM interface. The AMAC POG is investigating the proper test protocol to measure the physical signals at the DOD/DoE interface.
e. F-16 MLU: (Belgium and Netherlands) 21 stations required; 11 aircraft over a two- year moving window.
f. PA-200: (Germany and Italy) 21 stations required; 11 aircraft over a two-year moving window.
43
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business